Bathtub installation precautions

The bathtub has gradually become a single item that every household likes to add, improving the quality of life. After being tired, taking a bath comfortably is simply enjoyment. However, the installation of the bathtub is a problem. What should you pay attention to when installing? Xiaobian tells you. The bathtub has gradually become a single item that every household likes to add, improving the quality of life. After being tired, taking a bath comfortably is simply enjoyment. However, the installation of the bathtub is a problem. What should you pay attention to when installing? Xiaobian tells you.
The first step: test whether the water is leaking

“Before installing the bathtub, install the water fittings first, do the water shutoff, and see if the bathtub leaks. Pay special attention to the overflow.”

After lifting the bathtub into the bathroom, install the water fittings, fill the bathtub with water, close the water, check for water leakage. When the water flows over the overflow, the water in the bathtub flows out from the overflow. Hold your hand under the bathtub and touch the back of the overflow to see if water leaks from it. After the test of the overflow water is passed, the sealing of the sewage is checked next, and the method of standing can be selected to observe the sealing property of the sewage.

It should be noted that the center point of the width of the bathtub is at the center of the faucet. This point must be thought of when the water is changed at the beginning. The width of the bathtub is 700. 750? 800? Once the water is changed to determine the size of the water, try to buy the bathtub according to this, otherwise It is very difficult to change the size of the mixed water from the wall.

Step 2: Leveling the bathtub

When placing the bathtub, pay attention to the other end of the water outlet slightly higher than the end of the water outlet, so that the sewage will be poor in the future. This depends on the situation. The bottom of the normal bathtub is originally left with the slope of the drainage.

The third step: sand filling

Although the cast iron bathtub is strong, its thermal conductivity is very fast. It should be used in Zhonghesha, and it should be laid and tamped at the bottom of the bathtub. In the process of filling the river sand, in order to prevent the sand from leaking into the lower pipe, the fireman recommends: first seal the drain with glass glue, then use plastic sheeting, entangle the drain and the water pipe, and then fasten it with tape.

After all the placement work, the water release test is repeated (this step is mainly to ensure that the bathtub is not moved behind to make the water leak). After confirming the correctness, wait for the bricklayer to build the skirt.

After the bricklayer enters the scene, the river sand is filled in from all the gaps. The filling process is to fill the sand and use the wood boards, hands, feet, etc. to fill the sand as much as possible.

The fourth step: check and repair

A 300mm wide and 400mm hole is left at the drain, and a port is cut according to the size. The waterproof and anticorrosive wood board (thickness 40mm) is cut according to the size, and the bricks are arranged according to the calculated number of bricks and arranged on the board. On the wooden board. Extend the edge of the brick with a sealant and set it on the box.

Step 5: tiling

The tiling of the bathtub skirt does not need to catch the hair. The table with the red brick is built, and a layer of cement mortar is applied on the surface, and then the bricks can be affixed for two days. The tiling is very troublesome, because the ground leaves the slope, and the bathtub It is flat, so every big brick should be polished to different sizes. It can't be polished a lot at a time. It is easy to grind more and it needs to be repeatedly ground. The top edge of the brick should be tucked under the rounded edge of the bathtub so that no positive angle is formed.
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn

China leading manufacturers and suppliers of Seamless Pipe,Seamless Steel Pipe, and we are specialize in 316 Stainless Steel Pipe,Stainless Steel 304 Pipes, etc.

OD :1/2"-24"
WT :STD,SCH40,XS,SCH80 etc
Length: 12m maximum,fixed length or random length

Process Method: hot finish and hot expand and cold draw

Surface Treatment: Varnished, 3PE, 3PP, FBE, Galvanized etc coated.

Package:  Pipe's external surface painted with mill's black lacquer,beveled ends(OD≥2"),plain ends (OD<2"),both ends protected with plastic caps,bundled with metal strips, without wooden/pallet packages.

Quantity tolerance: -0/+10% per size,length tolerance for fixed length pipe:-0/+50mm

Seamless Steel Pipe

Seamless Pipe,Seamless Steel Pipe,316 Stainless Steel Pipe,Stainless Steel 304 Pipes

Liaocheng Xinglong Seamless Tube Manufacturing Co., Ltd. , https://www.lcxlpipe.com